Connected Coast - Van Anda Project

Three worker-operators are required to ensure the successful deployment of the cable. The operator at the stern guides the cable as it exits the vessel. The left-hand operator monitors the sea floor on a computer screen, while the middle operator controls the speed of the cable spool as the fibre optic cable unwinds from the spool.
49 Three Operators Controlling Cable Release - Rodger Hort Photography
Three worker-operators are required to ensure the successful deployment of the cable. The operator at the stern guides the cable as it exits the vessel. The left-hand operator monitors the sea floor on a computer screen, while the middle operator controls the speed of the cable spool as the fibre optic cable unwinds from the spool.